CLEANING AND PRIMING

All substrates are to be fixed and secured as per manufacturers instructions.

All substrates are to be checked for soundness, cleaned, swept, vacuumed and wiped over before works can begin.

Once cleaned and prepped, SAS Tradies Choice Master Primer is to be applied with a sponge or roller ensuring full coverage toall surfaces that will be waterproofed and or tiled.Forporous surfaces such as Cement Sheeting, Concrete etc dilute Tradies Choice Master Primer 3parts water to 1 part primer.

For non porous surfaces such as Scyon Sheets, Tradies Choice Moisture Barrier needs to be used as a primer.

Once primer has completely dried, Polyurethane sausage can be applied to all substrate intersectionsas bond breakers and tap/spout penetrations. When P/U has cured, waterproofing can commence.

*Please refer to SAS Tradies Choice WATERPROOFING spec sheets.

SCREEDS & LEVELLERS

Tradies Choice Fast Setting Screed can be installed before or after waterproofing.

If installed after waterproofing, we advise to let screed fully cure and waterproof over the top of the screed also. Primer mustbe applied before waterproofing on top of screed. Tradies Choice Master FS Additive can be added to screed to increase drying time.

Tradies Choice Master Leveller can be used for uneven surfaces where required.

Care should be taken to get correct falls on the screed to any wastes or edging as per Australian Standards. Unbonded screedswith min thickness of 40mm can also be placed on these membranes by first laying two plastic slip sheets over the membrane and then installing the topping screed. The use of expanded metal is recommended in screeds depending on screed thickness. For extra strength, Tradies Choice Master Additive can be added to screed.

Sand and Cement topping screeds can be placed directly on to the membrane as a bonded screed (utilizing a slurry and with theaddition of SAS Tradies Choice Master Additive to the screed  and are typically from a minimum 15mm thickness to a maximum thickness of 50mm). The use of expanded metal is recommended in the screed depending on screed thickness. For extra strength, Tradies Choice Master Additive can be added to screed.

Depending on the brand and type of under tile floor heating being used, it can be laid in the screed or placed on top of dry screed and covered with a self leveling compound. SAS Technical Team recommend tilers speak to manufacturers of under tile heating product to find out the best approach to the product.

Once screed or leveling compound has fully dried/cured, tiling can commence with the adhesives listed below.

WALL AND FLOOR TILING 

After all waterproofing membranes and screeds are fully cured, set out tiling. Floor tiles must be laid first and once dry, walltiling can commence.

Disclaimer: The information supplied is to the best of SAS knowledge and is true and accurate. The application of the productisbeyond SAS control and any alleged failure or damage must be inspected by a representative from SAS. All workman ship must be carried out in accordance with AS 3958.1-2007.

TILE INSTALLATION

Tiles should be fixed in accordance with Australian Standard AS 3958.1-2007 Apply the adhesive using a notched trowel onto the substrate. For tiles up to 300 x 300 mm use a 10mm notch trowel, and for Tiles greater than 400 x 400 use a 12mm notch trowel on the substrate and butter the back of each tile. Apply only up to 1m2 at a time. Press the tiles firmly into the adhesive before it skins. Do not spot fix, remove all excess adhesive from the tiles before it sets. Tiles should be fixed in accordance with the Australian Standards AS3958.1-2007.

Ensure the back of each tile is clean free form dust and other contaminants.

Apply the adhesive onto the substrate but do not exceed more than 1m2 at a time.

When back buttering is required use the straight side of the trowel and apply a thin coating of adhesive onto the tile.

When laying the tiles make sure you move the tile forward and back 90 degrees across the direction of the beads of adhesive leaving no voids under the tile. It is important to lift a tile every now and then to check that sufficient coverage is achieved 90-100%.

All adhesive residue must be removed from the tile and joint while the adhesive is still wet.

For all other applications not mentioned please contact the SAS Technical team.

Note: Protect tiling from other trades and weather. Do not allow traffic until all the tiling and grouting is completed For information not listed please contact SAS  for further information

PRECAUTIONS

All Tile installations must comply with Australian Standards AS-3958.

Expansion/movement joints in the substrates must be continued through tile finish and screeds.

DO NOT use premixed adhesives  to bond tiles over membranes as prolonged drying will occur.

Always protect tiling work in progress from bad weather, inundation of water and from other trades until such time all works arecompleted.

Do not use SAS Tradies Choice Waterproofing membranes, Adhesives or our LITOKOL Grouts below 50Cor above 350C

GROUTING

When all adhesive is dry/cured and all spacers have been removed from all joints. Clean up ready for grouting can begin.

Be sure to scrape out any excess adhesive that was missed during tiling so joints are empty. Vacuum all joints and prepare the grout. We recommend our LITOKOL Cementitious or Epoxy range of Grouts.

CAULKING/SILICON WORK

Once grouts have completely cured, caulking/silicon of all internal and external junctions can commence. 

Always leave the finished job clean, tidy and protected from other trades.